How do we know a coding agent has actually completed its task? A workflow connecting the mission contract, the builder’s handoff, deterministic checks, a separate evaluator’s decision and explicit acceptance.

Engineering case study2026Documented internal evaluationRelated implementation ↗

From task to evidence-backed verdict

Workflow schematic · not a performance measurement
  1. Step 1: Mission contract
  2. Step 2: Agent execution
  3. Step 3: Builder handoff
  4. Step 4: Deterministic checks
  5. Step 5: Separate evaluator
  6. Step 6: Recorded verdict
Figure 1. Conceptual summary of the documented evaluation process. A builder’s completion claim is not acceptance; the evaluator can reject the outcome on explicit criteria, and a critical veto overrides any number of passing checks.
The unit of analysis is the work the agent leaves behind — commits, state, handoff and evidence — not its final message.

01 / Purpose

The problem: a convincing completion is not proof

When an agent writes code, its final response may say a mission is complete even when requirements are missed, evidence is uncommitted or a critical rule has not been checked. A useful evaluation must examine the work itself and record what was actually verified.

This work emerged from building AgroUnu, a farm-management platform developed with bounded coding-agent missions and a separate evaluation process.

02 / Method

What the evaluation checks

  1. 01Written mission contract and acceptance criteria
  2. 02Static and deterministic domain checks: types, schemas, invariants, transitions
  3. 03Integration and journey tests against disposable infrastructure
  4. 04Deliberately seeded contradictions and adversarial cases
  5. 05Git, state and handoff inspection by a separate evaluator
  6. 06Critical vetoes and an explicit verdict: accept or reject

03 / Observed failure

A rejection that the process surfaced

SYS-01 was the mission that built the agent-control system itself. Its evaluator rejected it, then rejected the first repair as well.

Excerpt from recorded evaluator report

“only five of six required seeded contradictions fail deterministically”

SYS-01 evaluator report, 27 October 2026 (private). The same report found that a transition could pass both validators without an evaluation verdict. Repair cycle 1, the same day, passed 5 of 7 scenarios and detected all 11 seeded contradictions, but was rejected on a critical veto: acceptance could depend on uncommitted files.

Rejected · twice

The builder’s completion was not treated as acceptance.

Internal evaluation by a separate AI agent session; not third-party certification.

04 / Evidence model

Evidence before claims

Each mechanism leaves a record. These records exist in the programme repository; none is published yet, and each would need review and sanitising before release.

Evidence classQuestion it answersPublishing requirement
Mission contractWhat was the agent asked to deliver?Sanitised contract or excerpt
Builder handoffWhat revision, state and evidence did it leave?Provenance-checked handoff record
Deterministic checksWhich invariants and seeds were tested?Commands, configurations, pass/fail results
Evaluator decisionWhy was the result accepted or rejected?Criteria, scenario table and dated verdict

05 / Scientific & operational scope

What this does not establish

AgroUnu is pre-pilot and its recorded evaluations use synthetic farm scenarios. The evidence is one mission and two evaluation rounds. It does not establish frontier-model post-training performance, general reliability across agent architectures, or third-party certification.

The source code, reports and handoffs are private. Test counts alone do not establish production readiness.

The next meaningful investigation is a bounded public replay set: measure evaluator detection, false alarms and cost against explicit baselines.